Green Trust Sustainability & Renewable Energy

Off Grid and Efficient Products | Discussion Forums, Knowledgebase & News | Search | Support Green-Trust Amazon Store
News From the Front | Instructional eBooks and Videos | Green-Trust Photo Album | Newsletter | Links & Resources

Compare credit cards at Fool.co.uk and receive up to 15 months interest free credit.

Powered By
widgetmate.com
Sponsored By
Back Home Magazine

Monday, September 17, 2007

Weekend at Woodhenge

We spent the weekend working at Woodhenge. There was a new building site that needed preparation. We cut down a few trees, brush hogged the area, did some leveling, danced a jig when we mowed over a ground based yellow jacket nest, and other manual labor with a shovel and wheelbarrow. The well was extended an additional 100 feet, as it's been dry, and so was the well. There was a clay/rock mixture that needed to be cleaned up after that procedure. We went to Pulaski and picked up a virtually new solar power system to be set up next weekend. The system consisted of 550 watts of solar panels, a outback charge controller and inverter, and a 24v, 800 amp hour L16 battery pack. We also obtained a 5500 watt Hatz diesel powered Winco generator (12 hours on the hour meter), and picked a bushel or two of veggies from the organic garden. It's canning time at Woodhenge.


Web hosting by ICDSoft

Listed on BlogShares