Setting the posts for the solar array
Today we are picking up two 10′ sections of telephone poles for the posts for the new solar array. The phone company removed a pole that was broken at the base, and gave us the rest of the pole, cut in 10′ pieces. We will dig a hole 4′ deep, drop in the post, and fill the hole with concrete. a rock at the bottom with some concrete put in first will keep the post off the dirt at the bottom of the hole.
The top of pole array mounts we received are too small for the new panels (there was a mix up somewhere), so we wll mount our old Mitsubishi 110 watt panels first, and then when the second array mounts come in, we will mount the new Sanyo 195 watt panels. In the meantime, we will put the Sanyo’s on the old wooden fixed array mount that currently holds the Mitsubishi panels. We have a second Outback MX-60 charge controller coming in to handle the second array. This will bring us up to 1720 watts of pv, from 550 watts.
Professionally, I'm an IT Engineer (Executive Level) and Electronics Tech. Philosophically, I'm a Green Conservative, and probably would have been a hippie in the 60's if I had been old enough. I live off grid, with Solar (PV), Wind, and veggie oil fueled diesel generator power, and have been teaching and living sustainable technology for over 10 years.